Used Tetra Pak A3 CF 100V 250 prisma filling line - Year 2009Technical
Specifications & Performance DataThis complete carton bottling line is
configured for the 250 Prisma format and combines filling,
accumulation, straw application and cardboard packing functions in a
coordinated industrial packaging process. The line includes equipment
manufactured between 2009 and 2012, with the principal filling machine
identified as model A3 CF.Filling machine: A3 CF, manufactured in
2009, 100VAccumulator: ACHX30, manufactured in 2010Straw applicator:
SA30, manufactured in 2012Cardboard packer: CBP32, manufactured in
2010, 400VProduction format: 250 PrismaIncluded handling equipment: 1
paper trolley set and 2 paper reelsThe configuration is designed
around carton handling and secondary packaging rather than bottle
processing, making it suitable for industrial packaging applications
using Prisma-style carton formats.Advanced Automation & Control
SystemsThe line is composed of dedicated processing and packing
modules that support a sequential production workflow. The filling
machine is specified at 100V, while the cardboard packer is specified
at 400V. The accumulator provides a buffer between operations, helping
to maintain material flow when downstream equipment requires short
interruptions or adjustment time.The straw applicator performs a
dedicated packaging operation after filling, supporting a practical
carton presentation for end users. Electrical connection and
control-system integration should be evaluated during installation to
ensure correct synchronization between the individual
modules.Production Line Integration CapabilitiesThis used bottling
line is arranged as a carton filling and industrial packaging system
for the 250 Prisma format. The equipment sequence supports filling,
straw application, product accumulation and cardboard packing. The
included paper trolley is intended for handling paper reels associated
with carton production operations.Machine typeModelYearFilling
MachineA3 CF2009Various Equipment - Accumulation
SystemACHX302010Various Equipment - Straw ApplicatorSA302012Case
PackerCBP322010Various Equipment - Paper Reel TrolleyThe modular
layout allows the line to be assessed for integration with upstream
product preparation equipment and downstream case handling,
palletizing or warehouse logistics systems. Interconnecting conveyors
and line-control interfaces should be matched to the selected site
layout.Machine Condition & Maintenance HistoryThe equipment is offered
as a second hand complete carton bottling line. Its manufacturing
years range from 2009 to 2012. Buyers can evaluate the individual
modules as an integrated production line and plan commissioning,
inspection and routine service activities according to their operating
requirements.Before installation, standard checks for a used bottling
line typically include verification of electrical connections,
product-contact components, format-specific parts, carton transport
sections and packing-machine operating functions.Operational
Performance & VersatilityThe line is dedicated to the 250 Prisma
format across the filling machine, accumulator, straw applicator and
cardboard packer. This consistent format configuration supports
coordinated carton transfer through the principal packaging stages.
The accumulator helps balance production flow, while the straw
applicator and cardboard packer complete key consumer-packaging and
secondary-packaging operations.For beverage production and other
compatible liquid-product applications, carton filling lines of this
type are typically integrated with suitable upstream processing and
hygienic product supply systems. Format conversion requirements should
be assessed according to the intended carton design and packaging
specification.Installation Requirements & Site PreparationInstallation
requires a planned production-floor layout that accommodates the
filling machine, accumulator, straw applicator, cardboard packer and
paper-reel handling area. Electrical supply must be compatible with
the stated 100V filling-machine requirement and 400V cardboard-packer
requirement.A site should provide sufficient access for paper-reel
handling, carton flow, maintenance access and safe transfer of packed
cases. Utilities, guarding arrangements, conveyor interfaces and
controls should be installed and commissioned in accordance with the
final line layout and applicable operating procedures.Safety Standards
& Compliance CertificationSafe operation of this industrial packaging
line depends on correctly installed machine guarding, accessible
emergency-stop arrangements, protected electrical connections and
documented operating procedures. During commissioning, safety circuits
and interfaces between the filling, accumulation, straw application
and case-packing sections should be checked as part of the integrated
line installation.Operators should be trained in carton handling,
paper-reel trolley use, changeover procedures, cl